Ports and Harbors
EIR/EIS for Proposed Navigation Improvement Project
(Port of Los Angeles/ USACE Los Angeles District)
This project involved the comprehensive revision of a previously prepared document that focused on the effects of dredging and land filling in San Pedro Bay for Phase I of the 2020 Plan, with particular emphasis on the actions of the Port of Los Angeles. The Plan proposed the creation of an approximately 580-acre land filled expansion for terminal development to meet continued growing demand for Port terminals to accommodate the increasing national population and trade among Pacific Rim countries. The U.S. Army Corps of Engineers (USACE) also evaluated the effect of dredging required channels on the movement of waterborne commerce in the San Pedro Bay region. The proposed project was based on a feasibility study completed by the USACE, Los Angeles District on deepening existing navigation channels, dredging new channels, and disposing of the dredge material.
EIR Port of Long Beach A West Cleanup,
(Department of Toxic Substances Control (DTSC))
Chambers Group is providing CEQA Services for Remediation of Pier A West, Wilmington, California. Chambers Group is assisting the DTSC under contract to the Port of Long Beach (POLB), to conduct relevant studies and prepare an EIR pursuant to CEQA. The EIR is focused on the remediation project at Pier A West, consisting of excavation, stabilization, onsite placement of sump material in an engineered fill as well as treatment of volatile organic compounds in the groundwater and soil.